My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0541087
>
ARCHIVED REPORTS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:51:23 PM
Creation date
2/22/2019 3:50:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0541087
PE
2959
FACILITY_ID
FA0023524
FACILITY_NAME
SPX MARLEY COOLING FACILITY
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
01
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 8 <br /> ANALYSIS OF CHROMIUM CONCENTRATIONS AND REDUCTION POTENTIAL <br /> FORMER MARLEY COOLING TOWER SITE <br /> STOCKTON,CALIFORNIA <br /> Page 1 of 3 <br /> Percent Change in <br /> Most Recent Concentration Description of Trend for Key Indicator Parameters Potential for <br /> Monitoring Concentration(µ Concentrations fromg/L) has been Further <br /> Maximum Oxidation Reduction Recommendation` <br /> Well Total Chromium Total Chromium Below 50µg/L Chromium Iron Manganese Total Organic Carbon Chromium <br /> Potential <br /> Chromium VI Chromium VI Since' Reduction <br /> Injection Area Wells <br /> Below WQO after spike Reverted to MRP Section I Groundwater <br /> MW-6 29 16.2 91% 91% 1/2011 in 10/2010 Stable above WQO Decreasing above WQO Low Positive Goal achieved Monitorign Requirements <br /> Above WQO,below Reverted to MRP Section I Groundwater <br /> MW-8 175 175 -77% -75% Exceeds baseline,decreasing Near baseline Stable below WQO Low;decreasing Positive Low Monitorign Requirements <br /> MW-9 3J <0.5 -91% NM Before 2008 Stable below WQO Above WQO, Above WQO, Low Positive Goal achieved Continue performance monitoring per the MRP <br /> fluctuating fluctuating <br /> ° ° Fluctuating,currently Above WQO Reverted to MRP Section I Groundwater <br /> MW-101 <10 <0.5 -100/o -100/0 1/2009 Stable below WQO below WQO fluctuating Low Positive Goal achieved Monitorign Requirements <br /> Stable above WQO, Above WQO Above WQO Reverted to MRP Section I Groundwater <br /> MW-102 735 731 -39% -32% Exceeds decreasing increasing increasing Low Positive Moderate Monitorign Requirements <br /> 4/2011 Above WQO Above WQO Spike after 2010 Reverted to MRP Section I Groundwater <br /> MW-104(S-2) <10 <0.5 -100% -100% (5/2008) Stable below WQO increasing trend increasing trend injections,decreasing Positive Goal achieved Monitorign Requirements <br /> MW-105 <10 <0.5 -100% -100% 4/2008 Stable below WQO Below WQO Decreasing, <br /> above Reverted to MRP Section I Groundwater <br /> Low Positive Goal achieved Monitorign Requirements <br /> Stable above WQO, Above WQO Reverted to MRP Section I Groundwater <br /> MW-106 195 192 -61% -62% Exceeds below baseline fluctuating Below WQO Low Positive Low Monitorign Requirements <br /> MW-204(S-8) 6J <0.5 -100% -100% 4/2013 Below WQO Slightly above WQO Increasing,above WQO Low Positive Goal achieved Continue performance monitoring per the MRP <br /> and baseline <br /> MW-205(S-7) 450 339 -37% -50% Exceeds Stable above WQO, Slightly above WQO Baseline(ND) Low Positive Low Continue performance monitoring per the MRP <br /> below baseline <br /> 12/2010 Decreasing,above Reverted to MRP Section I Groundwater <br /> MW-206 6J <0.5 -100% -100% (7/2010) Stable below WQO Slightly above WQO WQLow Positive Goal achieved Monitorign Requirements <br /> Fluctuatingbelow the Reverted to MRP Section I Groundwater <br /> MW-207 21 21.2 -86% -86% 7/2012 WO Below WQO Below WQO Low Positive Goal achieved Monitorign Requirements <br /> Slightly above WQO Fluctuating;above Reverted to MRP Section I Groundwater <br /> MW-208 <10 <0.5 -100% -100% Before 2008 Stable below WQO and baseline WQO,increasing Low Positive Goal achieved Monitorign Requirements <br /> Below WQO and Near baseline,below Reverted to MRP Section I Groundwater <br /> MW-300 9J 7.45 -70% -63% Before 2008 Stable below WQO baseline WQO Low Positive Goal achieved Monitorign Requirements <br /> MW-301 12 9.29 -94% -93% 7/2012 Below WQO Slightly above WQO Stable above WQO Low Positive Goal achieved Continue performance monitoring per the MRP <br /> and baseline <br /> MW-303 <10 <0.5 -100% -100% Before 2008 Stable below WQO Decreasing near WQO Stable above WQO Low Positive Goal achieved Continue performance monitoring per the MRP <br /> Above WQO, Above WQO, Reverted to MRP Section I Groundwater <br /> TW-12 <10 <0.5 -100% -100% Before 2008 Stable below WQO increasing increasing Low Positive Goal achieved Monitorign Requirements <br /> 1/2009(Before Above WQO, Decreasing,above <br /> TW-14 <10 <0.5 -100% NM 2008) Stable below WQO fluctuating WQO Low Positive Goal achieved Continue performance monitoring per the MRP <br /> ° 1/2009(Before Above WQO, Above WQO, <br /> TW-17 <10 <0.5 -100/o NM 2008) Stable below WQO fluctuating increasing Low Positive Goal achieved Continue performance monitoring per the MRP <br /> EW-1 <10 <0.5 -100% NM 5/2008 Stable below WQO Below WQO Fluctuating;above Low Positive Goal achieved Continue performance monitoring per the MRP <br /> Below WQO after spike Above WQO, Above WQO Reverted to MRP Section I Groundwater <br /> TW-13 31 <0.5 -100% -100% 1/2013 in 10/2012 fluctuatingfluctuatingLow Positive Goal achieved Monitorign Requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.