Laserfiche WebLink
I <br /> I <br /> OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br />' Date: _._ Q Time of Arrival:__Z1 �Y <br /> Technician: Damon Mina rich/ __ c Time of Departure: _ <br />' Tom_ v.rws <br /> Site Engineer:- David Evans.._. ._.._ Was Site Engineeecontacted from field? Yes_ �No <br /> IPART A: GENERAL INFORMATION <br /> Site Location: Chevron 9-0557 139 South Center Street Stockton CA Project No. 77CH.90557.00.0ff350 <br /> KVA C-Sparger Panel 120V/ 16 A/G spar point s sy tem Elect. Meter Reading: y <br /> Electrical Power: 1 phase <br /> Hourmeter Reading: At Time J� <br /> I <br />' PART B: Ozone Sparge System <br /> System up or down upon arrival: <br />' Pressure Delivered to Sparge Point(PSI) <br /> Ile <br /> Sparge Point Pressure(PSI) <br /> OS-11S <br /> OS-1 D <br />' OS-2S Sy�''f4st 3�v'r`1Do.+s�a <br /> p vti '� L-44it <br />' OS-2D <br /> OS-3D <br />' OS-4D <br />' Cycle Timer(Min) <br /> Sparge Paint Cycle Timer(min) <br /> OS-1 S <br /> OS-ID <br /> OS-2S <br />' OS-2D <br />' OS-3D <br /> • OS-4D <br /> 1 <br />