Laserfiche WebLink
OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br />' Date: iD 1 3�o'er _ Time of Arrival: <br /> Technician: Time of Departure: <br /> Site Engineer: Bob Jackson Time Site Engineer was contacted: 90P` :roc CSc--Jcs�r€ f 't IJP <br /> PART A: GENERAL INFORMATION <br /> ISite Location: Chevron 9-0557, 139 South Center Street, Stockton,CA Project No. 77CH.90557.00.0350 <br /> KVA C-Sparger Panel: 120V/16 A 16 sparge point system Elect. Meter Reading: (,P <br />' Electrical Power: I phase <br /> Hourmeter Reading: 0-`i 3`L Time <br />' A Previous hourmeter reading 2620.05 Date/Time <br /> 9/27/02: 1108 <br />' B Current hourmeter reading <br /> L<i 3--?, t7 <br /> C Current reading minus previous reading <br /> tt� 'f <br /> D Total hours since last O&M event <br /> lie <br /> E C/D X 100 %Operability <br />' Report percent operability to site engineer prior to leaving site <br /> PART 13: Ozone Sparge System <br /> System up or down upon arrival: 51�-n <br />' Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) Previous(PSI) Sparge Point Cycle Timer(min) <br />' OS-1S 31--T 36 OS-1S <br /> OS-1D ;-7 29 0S-1D <br />' OS-2S d? 28 OS-2S <br /> OS-2D 37 OS-2D <br />' OS-313 3Z 32 OS-3D <br /> OS-4D 40 OS-4D <br /> I <br />