Laserfiche WebLink
' OZONE SPARGE SYSTEM <br /> . FIELD MONITORING DATA SHEETS <br />' Date: j j,j Time of Arrival: 11 .0q <br /> Technician: , ��, �� f Time of Departure: <br />' Site Engineer. __Bob Jackson_.. Time Site Engineer was contacted Jc 'WO <br /> PART A: GENERAL INFORMATION <br />' Site Location: Chevron 9-0557 139 South Center Street. Stockton CA Project No. 77CH.90557.00.0350 <br /> KVA C-Sparger Panel 120V/ 1G_A 16 spar-e point s stem Elect. Meter Reading <br /> Electrical Power: I phase <br /> Hourmeter Reading: 33gtJ Time 1 j tSL <br /> A Previous hourmeter reading 3239.64 Date/Time <br /> i11/7/02: 1300 <br /> B Current hourmeter reading <br /> C Current reading minus previous reading <br /> y <br /> D Total hours since last O&M event <br /> 10 E C/D X 100 <br /> L4190 %Operability <br /> j <br /> Report percent operability,to sr a engineer prior to leaving site <br /> i <br />' PART B: Ozone Sparge System <br /> PRIOR TO BEGINNING O&M INSPECT ALL OZONE CONVEYANCE LINES FOR CUTS CRACKS AND CRIMPS <br />' System status upon arrival: <br /> Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) Previous(PSI) Sparge Point Cycle Timer(min)ABC <br /> OS-1S _S3 35 OS-iS <br /> OS-11D -3 5� 35 CIS-11D <br /> OS-2S :31 33 OS-2S <br /> IOS-2D2'3$ 38 OS-2D <br /> 3� <br /> OS-30 37 OS-3D _ <br /> OS-4D �/� 45 OS-41) <br /> I <br />