Laserfiche WebLink
tOZONE SPARGE SYSTEM <br /> i FIELD MONITORING DATA SHEETS <br /> Date: �1� _ Time of Arrival: <br /> Technician: rl 9G',,Id __ Time of Departure <br />' Site Engineer:__ Bob Jackson Time Site Engineer was contacted: . <br /> PART A: GENERAL INFORMATION <br />' Site Location: Chevron 9-0557 139 South Center Street Stockton CA Project No. 77CH.90557.00.0350 <br />' KVA C-Sparger Panel: I 10 116 A 111 sparge point system Elect. Meter Reading: kp�5 <br /> Electrical Power: 1 phase <br /> Hourmeter Reading: 3 YU . �Q- Time . <br />' A Previous hourmeter reading 3394.16 Date/Time <br /> 11/15/02: 1126 <br /> B Current hourmeter reading <br /> C Current reading minus previous reading ` <br /> D Total hours since last O&M event <br /> E C/D X 100 %Operability <br /> Report percent operability to site engineer prior to leaving site <br />' PART B: Ozone Sparge System <br /> PRIOR TO BEGINNING O&M INSPECT ALL OZONE CONVEYANCE LINES FOR CUTS, CRACKS.AND CRIMPS <br />' System status upon arrival: (40 <br /> Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) Previous(PSI) Sparge Point Cycle Timer(min)ABC <br /> OS-1S 33 OS-1S <br />' 0S-1D 3-I 35 OS-1D It` <br /> OS-2S 31 OS-2S _ 1� <br />' OS-2D 3te 38 OS-2D F -� <br /> OS-3D 37 OS-3D <br /> IOS-4D �� 45 OS-4D f <br /> I <br />