My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000562
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
ARCHIVED REPORTS XR0000562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:53:45 PM
Creation date
2/22/2019 3:53:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000562
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />' OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> IDate' �>'�� Time of Arrival:_ JO <br /> Technician: i t��iC LIZ _ Time of Departure: <br /> Site Engineer: Bob Jackson_ Time Site Engineer was contacted: <br /> PART A: GENERAL INFORMATION <br />' Site Location: Chevron 9-0557, 139 South Center Street Stockton,CA Project No. 77CFi.90557.00.0350 _ <br /> KVA C-Sparger Panel: 120V/ l6 A/6 sparge point s,s� tem Elect. Meter Reading: <br /> Electrical Power. I Qhase <br /> Hourmeter Reading:5'7 SL qfY,_ Timed" /•'JOU <br /> A Previous hourmeter reading 3532.31 Date/Time <br />' 11/22/02: 12:20 <br /> B Current hourmeter reading <br />' 37 <br /> C Current reading minus previous reading <br /> zao t <br /> D Total hours since last O&M event <br />' E C/D X 10083 . %Operability <br /> Report percent operability to site engineer prior to leaving site <br /> 1 <br /> PART B: Ozone Sparge System <br /> PRIOR TO BEGINNING O&M INSPECT ALL OZONE CONVEYANCE LINES FOR CUTS CRACKS AND CRIMPS <br /> System status upon arrival: UD <br /> Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) Previous(PSI) Sparge Point Cycle Timer(min)ABC <br />' OS-118 -3S 37 OS-11S r <br /> OS-113 910 34 OS-1D <br />' OS-2S 3J.— 31 OS-2S I <br /> OS-2D 36 OS-2D <br /> ' QS-313 X37 39 OS-3D { <br /> OS-41D 45 QS-4D <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.