My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000563
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
ARCHIVED REPORTS XR0000563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:08:18 PM
Creation date
2/22/2019 3:56:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000563
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR <br /> 3017 Kilgore Road,Suite 100 <br /> C 0 R1i!'CC1R!}OiL=;T Rancho Cordova_CA 95670_ <br /> -916-861-0430 FAX <br /> July 2, 2003 <br /> Jul- n '.' Z003 <br /> i.1\1V1, <br /> PFR 111,SERVIUE <br /> Ms. Victoria McCartney <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 1 <br /> RE: Second Quarter 2003 Groundwater Monitoring & Sampling Report <br /> Former Chevron Service Station 9-0557 �'. <br /> 139 South Center Street <br /> Stockton, California <br /> SECOR Project No.: 77CH.00000.09.0002 <br /> Dear Ms. McCartney: <br /> SECOR International Incorporated is providing this report to summarize the second quarter 2003 <br /> (2Q2003) groundwater monitoring event at the above-referenced site. <br /> COMPLETED ACTIVITIES - SECOND QUARTER 2003 <br /> • Conducted quarterly groundwater monitoring and sampling. <br /> • Prepared and submitted quarterly groundwater monitoring report. <br /> ■ Abandoned monitoring wells MW-1, MW-2, MW-4, MW-9, MW-9A, MW-9S, MW-10, MW-11, <br /> MW-12 and ozone sparge wells OS-1 S/1 D through OS-4S/4D. <br /> • Removed all above ground and subsurface facilities. <br /> ■ Submitted status demolition report. <br /> ■ Prepared well installation work plan. <br /> PLANNED ACTIVITIES - THIRD QUARTER 2003 <br /> • Conduct quarterly groundwater monitoring and sampling. <br /> ■ Prepare and submit quarterly groundwater monitoring report. <br /> • Prepare well installation work plan. <br /> ■ Install monitoring wells. <br /> DISCUSSION <br /> On April 4, 2003, Gettier-Ryan Incorporated (G-R) performed 2Q2003 groundwater monitoring and <br /> sampling. G-R's groundwater monitoring report is included as Attachment A. Depth to groundwater <br /> across the site ranged from 23.77 to 24.99 feet below ground surface (bgs). Groundwater elevation <br /> across the site increased an average of 0.5 feet from the previous sampling event. Groundwater <br /> flow was to the east/southeast at an approximate gradient of 0.001 to 0.003 foot per feet. A <br /> summary of laboratory results are listed below. <br /> l:tChevronW05571Periodic Monitoring120031202003 QMR 90557.doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.