Laserfiche WebLink
' OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br />' Date: Jr:` ^ Z Time of Arrival: 11 ', 00 <br /> Technician:r /�.5c... <br /> ,� Time of Departure: <br />' SiteEngineer: `: —1—c..., S Was Site Engineer contacted from field? Yes�o <br /> PART A: GENERAL INFORMATION <br />' Site Location. Chevron 9-0557 139 South Center Street Stockton CA Project No. 77CH.43445.00.0352 <br /> KVA C-5parger Panel: 120V/ 16 A/6 s are point system Elect. Meter Reading: <br />' Electrical Power:, 1 phase <br /> Hourmeter Reading: —1 9 , 0 At Time 0 C2 <br /> 1 <br /> PART B: Ozone Sparge System <br /> System up or down upon arrival: 0 <br /> Cycle Timer(min): OS-1S i OS-ID <br /> OS-2S OS-21D 1 �l <br /> lie <br /> OS-3S ._ OS-30B`' I'1," J— <br /> OS4S �� OS-4D +'� L`°�°''- i <5v A <br /> PART C-TROUBLESHOOTING(complete It system was down upon arrival at site) <br /> a. Give details of system status upon arrival. <br /> S L, <br /> 7' 4 <br /> 1 <br />' b. Give details of work performed to troubleshoot the problem_ +^ 3 <br /> '. n. c ,r <br /> U C <br /> CA o <br /> 1 <br />