Laserfiche WebLink
1 <br /> OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> pate: ` 1f Z-/,)2- Time of Arrival: <br /> Technician:_ k; 44(-><S11-3 Time of Departure: <br /> Site Engineer:___ Was Site Engineer contacted from field? Yes—No-- <br /> PART <br /> o _PART A: GENERAL INFORMATION <br />' Site Location: Chevron 9-0557 139 South Center Street Stockton CA Project No. 77CH.43445.00.0352 <br /> KVA C-Sparger Panel_120V/16 A/6 sparge point system Elect. Meter Reading: <br />' Electrical Power:_t phase <br /> Hourmeter Reading: 90 3Y-'�;3—7 At Time <br /> 1 <br />'PART B: Ozone Sparge System <br /> System jgqor down upon arrival: <br />'PSI <br /> os-is tY <br />'. OS-1 D ! fSS <br /> OS-2S 1 <br />' 0S-2D t! <br /> OS-3D <br />' OS-4D Io YST� <br /> I <br />'PART C:TROUBLESHOOTING(complete It system was down upon arrival at site) <br /> a. Give details of system status upon arrival. rAC I G r - I C8—,3> <br />' b. Give details of work performed to troubleshoot the problem. <br /> i <br />