Laserfiche WebLink
' OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br />' Date: S o 2 Time of Arrival: 12-60 <br /> Technician: oS sac .a Time of Departure: /V,00 <br /> Site Engineer:__ Was Site Engineer contacted from field? Yes. No_ � <br />' PART A. GENERAL INFORMATION <br /> Site location: Chevron 9-0557, 139 South Center Street, Stockton, CA Project No. 77CH.43445.00.0352 <br /> I KVA C-Sparger Panel, _120V/ 16 A/_G sparge noint system Elect. Meter Reading: — 38z <br /> Electrical Power: I phase <br />' Hourmeter Reading: -751 Clio At Time <br />' PART B. Ozone Sparge System <br /> System up or down upon arrival: UP <br /> Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) <br /> OS-1S Y5�1 <br /> OS-1D ri: <br /> OS-2S t H 9 SZ <br /> 08-21) 11115--- <br /> OS-3D 1tPSTOS-3D I la Ys J <br /> OS-41) t-7 YS r <br /> Cycle Timer(Min) <br /> Sparge Point Cycle Timer(min) <br /> OSA S 11 _ <br /> OSA D 1 I <br /> I OS-2S <br /> OS-2D jL <br /> OS-3D it <br /> OS-413 <br /> I <br /> 1 <br />