Laserfiche WebLink
1 r <br /> OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date: 2� O� Time of Arrival: <br /> Technician: _ wig op-Z Time of Departure: <br /> Site Engineer: Was Site Engineer contacted from field? Yes NoX_ <br /> PART A: GENERAL INFORMATION <br /> rSite Location: Chevron 9-0557 139 South Center Street Stockton CA Project No. 77CH.43445.00.0352 <br /> KVA C-Sparger Panel: 120V/16 A/6 sparge point system Elect.Meter Reading: <br /> Electrical Power: I phase <br /> 361 <br /> Hourmeter Reading:1 © _ _At Time 4 <br />' PART 8: Ozone Sparge System <br /> System up or down upon arrival: TP <br />' Pressure Delivered to Sparge Point(PSI) <br /> AM <br /> Sparge Point Pressure(PSI) <br /> 0S-1S [ �`�%� I - ( .2-0 <br /> 2 AD <br /> OS-1 D n <br /> OS-2S <br /> 1 _ <br /> OS-2D r <br /> OS-3D © S <br /> OS-4D <br /> Cycle Timer(Min) <br /> Sparge Point Cycle Timer(min) <br /> OS-11S <br /> 08-1 13 <br /> OS-2S <br /> I OS-2D <br /> OS-3D <br /> OS-4D <br />