Laserfiche WebLink
OZONE SPARGE SYSTEM <br /> • FIELD MONITORING DATA SHEETS <br /> fDate: (,.-+R-a�, Time of Arrival: <br /> Technician: c-,T)u;n I _ Time of Departure: <br /> Site Engineer: Wlir e-#4 HC, Was Site Engineer contacted from field? Yes , _Na <br /> PART A: GENERAL INFORMATION <br />' Site Location: Chevron 9-0557, 139 South Center Street, Stockton,CA Project No. 77CH.4344"0.0352 <br /> KVA C-Sparger Panel: 120V/16 A I6 s are oinl s stem Elect. Meter Reading: / •02 _ <br />' Electrical Power: I phase <br /> Hourmeter Reading: O_ a+l� At Time //,50 <br /> I <br />' PART B: Ozone Sparge System <br /> System up or down upon arrival: <br />' Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) <br /> lie OS-11S <br /> OS-1 D �7 taf t��•r �*St•,(, c•a�s 1��:2� ?.Er����� �r.sS ErYc <br /> OS-2S riai� <br /> OS-2D _ 30 <br />' OS-3D —..1n <br /> OS-4D <br /> 1 <br /> I Cycle Timer(Min) <br /> Sparge Point Cycle Timer(min) <br /> os-1 s I I <br />' OS-1D <br /> OS-2S <br /> OS-2D <br />' OS-3D <br /> OS-4D <br /> r <br />