Laserfiche WebLink
' OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br />' Date: 6125/02 Time of Arrival: <br /> Technician:Bob Jackson Time of Departure: <br />' Site Engineer: Dave Evans Was Site Engineer contacted from field? Yes fJo <br /> PART A. GENERAL INFORMATION <br /> Site Location: Chevron 9-0557, 139 South Center Street,Stockton,CA Project No. 77CH.43445.00.0352 <br /> KVA C-Sparger Panel: 12OV/ 16 A 16 sparge point system Elect.Meter Reading: ,p `k. 1 3 <br /> Electrical Power: 1 phase l+e [l <br /> Hourmeter Reading: 1.5 tP At Time K-J 114 a-- 61-v <br />' PART B. Ozone Sparge System <br /> System up or down upon arrival: t? <br />' Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) <br />'. OS-iS <br /> OS-11D <br />' OS-2S }$ <br /> OS-2D Irl <br />' OS-3D L-4 <br /> OS-4D !`! <br /> Cycle Timer(Min) <br />' Sparge Point Cycle Timer(min) <br /> OS;-1S 1 rka <br />' OS-1 D <br />' OS-2S <br /> OS-2D <br />' OS-3D <br /> OS-4D <br /> 1 <br /> 1 <br />