Laserfiche WebLink
OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date: Time of Arrival: <br /> Technician: t'�f6 Time of Departure: <br />' Site Engineer: _ Was Site Engineer contacted from field? Yes No_. <br /> PART A: GENERAL INFORMATION <br /> 1 Site Location: Chevron 9-0557, 139 South Center Street Stockton,CA Project No. 77CH.43445.00.0352 <br /> KVA C-Sparger Panel: 120V 1 16 A/G sparge point system Elect. Meter Reading: J1,-7 <br />' Electrical Power: I phase <br /> Hourmeter Reading: O(� At Time $- <br />' PART S: Ozone Sparge System <br /> System up or down upon arrival: _ r—( <br /> Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) <br /> lieOS-1S <br /> OS-10 Z 5 <br />' OS-2S ZS <br /> OS-2D 31 <br />' OS-3D 2� <br /> OS-4D <br /> Cycle Timer(Min) <br />' Sparge Point Cycle Timer(min) <br /> OS-1S I <br />' OS-1 D 1 <br />' OS-2S 1 t <br /> OS-2D I l <br /> OS-3D II <br /> OS-4D I <br />