Laserfiche WebLink
' OZONE SPARGE SYSTEM <br /> • FIELD MONITORING DATA SHEETS <br /> Date:JuPf' ,2002 Time of Arrival: <br /> Technician- Damon Minarich Time of Departure: <br /> Site Engineer: David Evans Was Site Engineer contacted from field? Yes_ ,c No <br />' PART A: GENERAL INFORMATION <br /> Site Location: Chevron 9-0557 139 South Center Street Stockton CA Project No. 77CH.90557.00.0352 <br /> KVA C-Sparger Panel: 120V/16 A 16 sparge Point system Elect. Meter Reading: _'267 <br /> Electrical Power. 1 phase <br /> Hourmeter Reading: n rl5s�l hL— At Time <br /> 1 <br /> PART B: Ozone Sparge System <br /> System up or down upon arrival: <br />' Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) <br />'• <br /> 0S-1S <br /> 0S-1D <br /> OS-2S <br /> OS-2D <br />' OS-3D <br /> OS-4b <br />' Cycle Timer(Min) <br /> Sparge Point Cycle Timer(min) <br />' OS-1S Z� <br /> OS-1 D <br />' OS-2S j <br /> OS-2D <br />' OS-3D <br /> • 05-4D <br /> 1 <br />