Laserfiche WebLink
' OZONE SPARGE SYSTEM <br /> • FIELD MONITORING DATA SHEETS <br /> ate: Time of Arrival: <br /> Technician: IAlmno Time of Departure: 1.15 <br />' Site Engineer f , Laic�.� _ Was Site Engineer contacted from field? Yes >� _No, <br /> PART A: GENERAL INFORMATION <br />' Site Location: Chevron 9-0557 139 South Center Street Stockton CA Project No. 77CH.43445.00.0352 <br /> KVA C Sparger Panel: 120V/ 16 A 1 G saroe oint s stem Elect. Meter Reading: <br /> Electrical Power: t phase <br /> Hourmeter Reading: 2WL67 At Time <br /> 1 <br /> PART B: Ozone Sparge System <br /> System up or down upon arrival: Li# <br /> Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) <br /> 1� <br /> OS-IS <br /> OS-11D <br />' OS-2S <br /> OS-2D <br /> OS-3D <br /> OS-4D <br /> i <br /> Cycle Timer(Min) <br />' Sparge Point Cycle Timer(min) <br /> OSA S li <br /> OSAID <br /> OS-2S <br />' OS-2D { <br /> OS-3D F <br /> iOS-4D 1 <br />