Laserfiche WebLink
OZONE SPARGE SYSTEM <br /> . FIELD MONITORING DATA SHEETS <br /> Date: -0.2 Time of Arrival: jt 5 <br /> i <br /> Technician:Damon Minarich Time of Departure: <br /> Site Engineer: David Evans Was Site Engineer contacted from field? Yes No <br /> PART A: GENERAL INFORMATION <br /> ISite Location: Chevron 9-0557 139 South Center Street,Stockton,CA Project No. 77CH.43445.00.0352 <br /> ff] <br /> KVA C-Sparger Panel: 120V/ 16 A 16 s are point system Elect.Meter Reading: <br />' Electrical Power: 1 phase <br /> Hourmeter Reading: At Time <br />'PART B: Ozone Sparge System <br /> System up or down upon arrival: <br />'Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) <br /> • 0S-1S 2 <br /> 0S-1D <br /> OS-2S <br /> OS-2D <br />' OS-3D <br /> OS-4D <br /> Cycle Timer(Min) <br /> Sparge Point Cycle Timer(min) <br /> os-Is f 1 <br />' OS-1D <br /> OS-2S <br />' OS-2D 1 <br />' OS-3Q <br /> OS-4D <br /> • <br /> 1 <br />