My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000569
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
ARCHIVED REPORTS XR0000569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:43:46 PM
Creation date
2/22/2019 4:01:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000569
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: June 28,2002 \':�( OR <br /> International Incoporated <br /> CHEVRON GROUNDWATER MONITORING REPORT (2Q2002) <br /> Primary Agency: Margaret Lagorio <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue, Third Floor ��� <br /> Stockton, CA 95202 <br /> JUL 0 1 2002 <br /> ENVIft01•lilhEN'l HEaLT;-i <br /> Facility No.: 9-0557 Address: 139 South Center Street,Stockton,CalifoKAMIT/SERVICES <br /> CHEVRON Project Manager: Robert Cochran <br /> Consulting Co./Contact Person: SECOR International Inc, — William Brasher <br /> Consultant Project No.: 77CH.00000.00.0002 <br /> Assembly Hill 681 Status: Property Owner: Chevron Products Company <br /> WORK PERFORMED THIS QUARTER: Second Quarter—2002: <br /> 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted groundwater monitoring report. <br /> 3. Continued ozone sparging pilot test. <br /> 4. Installed proposed monitoring well MW-13. <br /> WORK PROPOSED FOR NEXT QUARTER: Third Quarter - 2002: <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit groundwater monitoring report. <br /> 3. Continue ozone sparging pilot test. <br /> 4. Prepare and submit progress report for ozone sparging pilot test. <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project: Monitoring and Sam lin /FeasibUity Testing <br /> Frequency of Groundwater Sampling: Quwlerly <br /> Frequency of Groundwater Monitoring: Quarterly - <br /> Is Free Product(FP)Present On-Site: No <br /> Current Remediation Techniques: N/A <br /> Approximate Depth to Groundwater: 22.23 to 23.56 feet <br /> Groundwater Gradient: Southeast @ 0.002 ft/ft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916.561.0400 916.861.0430 Fax u,u,u,.secor.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.