My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000572
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
ARCHIVED REPORTS XR0000572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 8:38:53 PM
Creation date
2/22/2019 4:03:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000572
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 V r 4- VA 11{J L 1 J,r f 44l L V 1 V O V 1 V n J V J v V v L\-J A 4 R^ - a V . - <br /> 10/26/2801 <br /> v ti16/21;/2882 15:69 2899378137 STORMWATER PAGE 84 <br /> MUNICIPAL UTILITIES DEPARTMENT <br /> REGIONAL WASTEWATER CONTROL FACILITY <br /> ONSTOCKTON, c UPO DRIVE <br /> Groundwater Discharge Attachment <br /> ClrY OF STOCKTCM (M) 9448750 <br /> ga48760 Part G - Pumping Plan <br /> PURPOSI; --Description of all aspects of the pumping plan will enable the City of Stockton to evaluate the plan <br /> for possible approval. <br /> Fvrthsr instructions on reverse side. <br /> Cl- Description—Pully desct{be the proposed pumping plan. "including number and size of wells, types and capacities <br /> of pumps, and all other relevant information. (Attach description). <br /> C2. Pretreatment -- Describe any proposed groundwater pretreatment prior to dlhhqfge to thes nitary system, and <br /> give cted lutant removal efficiancies. (Attach sheets as recess ). �-•J <br /> Su <br /> Inv <br /> C3. Analyses -- Attach pertinent laboratory analyses to verify contaminants and concentrations. <br /> C4. Calculations-•--Calculate the paun s/day of each contaminant oposel to be discharged tp th sewer. ttach work <br /> sheets). <br /> C5. Pollution Control—bescrib steps taken to prevent resent d future groundwater ntamination.(Attach sheets <br /> as necessary). <br /> CS. Saud a Disposal—describe sludge disposal methods that will be utilized if appk*ble.(Attach sheets as nocessary). <br /> C7. M" elle us—Give ar+y other pert* eht facts Or f rs that wartan ra idef tion.(Attach as nei;Mery). <br /> I <br /> C6. Diagrarn ,- Attach as accurate a diagram of the plume or area of contamination. as is available. <br /> C9. Sample Schedule—Attach at proposed sampling schedule and method of results transmittal to the City of Stockton. <br /> Indicate sample point. <br /> suo 1000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.