Laserfiche WebLink
Chevron Products Company <br /> 4 <br /> Chevron Service Station#9-0557,139 South Center Street,Stockton,California 6/01/01 <br /> treatment works. The aquifer test well be conducted over an approximate 4-day <br /> period. A more detailed description of Aquifer Test procedures is presented as <br /> Attachment E. <br /> Schedule <br /> A schedule for the completion of the work proposed within this work plan is presented <br /> as Figure 3. This schedule includes estimated work plan review and comment period by <br /> SJCEHD and estimated duration for permitting required with SJCEHD and San Joaquin <br /> Valley Unified Air Quality Control District (SJVUAPCD). <br /> If there are any questions regarding the contents of this revised work plan, please call us <br /> at 916.861.0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> -David M. Evans <br /> Staff Scientist <br /> William E. Brasher, P.E. <br /> Senior Engineer <br /> Attachments: <br /> Figure 1 — Site Location Map <br /> Figure 2 — Site Plan with Proposed Well Locations <br /> Figure 3 —Proposed Schedule <br /> Attachment A—April 9, 2001 SJCEHD Letter <br /> Attachment B — Summary of Previous Investigations <br /> Attachment C--Field and Laboratory Procedures <br /> Attachment D —Overview of DPE Treatment <br /> Attachment E— Overview of Aquifer Test Procedures <br /> cc: Bob Cochran, Chevron Products Company, San Ramon <br /> Marty Hartzell, Regional Water Quality Control Board, Sacramento <br /> Sheldon Nelson, Chevron Research and Technology Company, San Ramon <br /> Mark Trewartha, SECOR, Portland <br /> [:\Chevron1905571RFPORTS\Feasibility Study4orkplan.doc <br />