Laserfiche WebLink
t <br /> Date: April 18,2001 SECOR <br /> CHEVRON GROUNDWATER MONITORING REPORT (I Q2001) <br /> Primary Agency: Dot Lofstrom <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No.: 9-0557 Address: 139 South Center Street,Stockton, California <br /> CHEVRON Project Manager: Robert Cochran <br /> Consulting Co./Contact Person: SECOR International, Inc. —Roger Hoffmore <br /> Consultant Project No.: 077.43461.002 <br /> Assembly Bill 681 Status: Property Owner: Chevron Products Company <br /> WORK PERFORMED THIS QUARTER: First Quarter—2001: <br /> • 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted groundwater monitoring report. <br /> 3. Submitted Site Assessment Report. <br /> WORK PROPOSED FOR NEXT QUARTER: Second Quarter- 2001: <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit groundwater monitoring report. <br /> 3. Prepare and submit Corrective Action Plan(CAP). <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project: Monitoring and Sampling, and Site Assessment <br /> Frequency of Groundwater Sampling: Quarterly <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP) Present On-Site: Yes <br /> Current Remediation Techniques: N/A <br /> Approximate Depth to Groundwater: 22 to 23 feet <br /> • Groundwater Gradient: Southeast 01.002 ft/ft <br /> 3017 Kilgore Road, Suite 100, rancho Cordova, CA 95670 916,861.0400 916.861.0430 Fax uwm-,secor.com <br />