My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000579
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
ARCHIVED REPORTS XR0000579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:14:53 PM
Creation date
2/22/2019 4:06:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000579
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> Date: December 15,2000 SECOR <br /> International Incorporated <br /> CHEVRON QUARTERLY GROUNDWATER MONI'r0R1NG REPORT (3Q2000) <br /> Primary Agency: Ron Rowe <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No.: 9-0557 Address: 139 South Center Street,Stockton,California <br /> CHEVRON Project Manager: Robert Cochran <br /> Consulting Co./Contact Person: SECOR International, Inc. —Roger Hoffmore <br /> Consultant Project No.: 077.41991.007 <br /> Assembly Bill 681 Status: Property Owner: Chevron Products Company <br /> WORK PERFORMED THIS QUARTER: Third Quarter—2000: <br /> 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted groundwater monitoring report. <br /> 3. Site assessment report in progress. <br /> WORK PROPOSED FOR NEXT QUARTER: Fourth Quarter- 2000: <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit groundwater monitoring report. <br /> 3. Finalize and submit Site Assessment Report. <br /> U <br /> Q ARTERLY RESULTS SUMMARY: <br /> Current Phase of Project: Monitoring and Sampling, and Site Assessment <br /> Frequency of Groundwater Sampling: Quarterly <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP) Present On-Site: No <br /> Current Remediation Techniques: NIA <br /> Approximate Depth to Groundwater: 21 to 22.5feet <br /> Groundwater Gradient: Southeast @ 0.002filft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 976. 361.0400 916.861.04.10 Fax uww.secor.cona <br />
The URL can be used to link to this page
Your browser does not support the video tag.