Laserfiche WebLink
139 South Center, Stockton, California April 12, 1994 <br /> Chevron U.S.A. Products Company Page 3 <br /> TASK 4: :PROJECT SCHEDULE <br /> Groundwater Technology is prepared to begin work on this project within two weeks of work plan <br /> approval by the SJCPHS-EHD. Drilling and soil sampling will be completed over a two to three day <br /> period. The report will be submitted approximately three weeks after the receipt of all laboratory <br /> analyses results. <br /> i <br /> Please contact our West Sacramento office at 916-372-4700 if you have questions or comments <br /> about this work plan. <br /> Sincerely, <br /> Groundwater Technology, Inc. Groundwater Technology, Inc. <br /> Written/Submitted by Reviewed/Approved by <br /> BRUCE D. BEALE 4aff <br /> ON M. FEDOTA <br /> Associate Geologist Geologist <br /> Project Manager <br /> ,✓n cxo10 <br /> wG� PS �E D) % 1 <br /> d_ SIMONIS, R.G. <br /> ►ss Na. 4412 e for Environmental Geologist <br /> BDB/JMF/EKS:rz <br /> 5039ASGA.W KP g <br /> CALIF <br /> attachments <br /> " GROUNDWATER <br /> TECHNOLOGY <br />