Laserfiche WebLink
• Project Number: S17E.1754D204.72 <br /> Consultant Project Number: 203-175.3291 <br /> Contract Number: N46CWCO244-9-X <br /> Facility Number: 9-0557 <br /> Worlr Order Number: D004131 <br /> Report Issue Date: April 10, 19W <br /> Table 5 <br /> INITIAL CALIBRATION VERIFICATION STANDARDS RESULTS <br /> Total Threshold Limit Concentration in Soil <br /> Date of Analysis: 04/06/90 <br /> Expected Result, Observed Result, Acceptability <br /> Analyte mg/L mg/L Recovery, % Limits, % <br /> Cadmium 4.0 4.2 105 80 - 120 <br /> Chromium 4.0 4.2 105 80- 20 <br /> Lead 4.0 4.2 105 80- 120 <br /> Zinc 4.0 4.2 105 80- 120 <br /> GTEL Concord,CA Page 7 of 10 <br /> DW4131.DOC MGTEL <br /> E N V I A O N M£N T A L <br /> 1AbORA1DRIES. INC <br />