My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001286
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 2:11:09 PM
Creation date
2/25/2019 10:44:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001286
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: October 31, 2000 <br /> Quarter: 3Q00 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 4493 Address: 205 North Center Street,Stockton,CA <br /> ARCO Environmental Engineer: Paul Supple <br /> Consulting Co./Contact Person: SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No.: 077.41907.703 <br /> Primary Agency/Regulatory ID No.: San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status: Property Owned by City of Stockton <br /> WORK PERFORMED THIS QUARTER (Third Quarter—2000): <br /> 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Prepared and submitted site assessment report. <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter—2000): <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Prepare and submit work plan for additional site assessment. <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project: Monitoring/Assessment <br /> Frequency of Groundwater Sampling: MW-1 through MW-7 are sampled quarterly. <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP)Present On-Site: No <br /> Current Remediation Techniques: Natural Attenuation <br /> Approximate Depth to Groundwater: 12.5 to 14.5 <br /> Groundwater Gradient: Southeast 0 0.012 <br /> DISCUSSION: <br /> TPHg was reported in three of the seven groundwater monitoring wells sampled this quarter at concentrations ranging <br /> from 75.7 ppb(MW-3)to 3,460 ppb(MW-4). Benzene was reported in five of the seven wells sampled this quarter at <br /> concentrations ranging from 0.512 ppb(MW-3)to 234 ppb(MW-4). MtBE(EPA Method 8260) was reported in three <br /> wells sampled this quarter at concentrations ranging from 102 ppb(MW-6)to 1,710 ppb(MW-4). Trichloroethene <br /> (TCE) was reported in three of the seven wells sampled this quarter at a maximum concentration of 185 ppb(MW-1). <br /> Cis-1,2-Dichloroethene was reported in five of the seven wells sampled at concentrations ranging from 3.40(MW-5) <br /> to 361 ppb(MW-1). Groundwater elevations across the site decreased by an average of.63 feet this quarter,and flow <br /> was to the southeast with a hydraulic gradient of approximately 0.0 12 ft/ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.