My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001290
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 11:48:04 AM
Creation date
2/25/2019 10:48:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001290
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: June 13, 2000 <br /> Quarter: IQ00 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 4493 Address: 205 North Center Street, Stockton, CA <br /> ARCO Environmental Engineer: Chuck Carmel <br /> Consulting Co./Contact Person: SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No.: 077.41907.701 <br /> Primary Agency/Regulatory ID No.: San Joaquin Count Environmental Health Department <br /> Assembly Bill 681 Status: Property Owned by City of Stockton <br /> WORK PERFORMED THIS QUARTER (First Quarter- 2000): <br /> 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> WORK PROPOSED FOR NEXT QUARTER (Second Quarter— 2000): <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Install three groundwater monitoring wells and advance one soil boring for vertical definition. <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project: Monitorin Assessment <br /> Frequency of Groundwater Sampling: MW-1 through MW-4 are sampled guarterly. _ <br /> Frequency of Groundwater Monitoring: Ouay&rly <br /> Is Free product(FP)Present On-Site: No <br /> Current Remediation Techniques: _ Natural Attenuation <br /> Approximate Depth to Groundwater: 12.12 to 13.21 <br /> Groundwater Grmdient: EEL-NUtheM is Q.0-05 <br /> DISCUSSION: <br /> TPHg was reported in three of the four wells sampled this quarter at concentrations ranging from 52.2 ppb(MW-2 <br /> to 5,330(MW-4). Benzene was reported in two wells sampled this quarter at a maximum concentration of 298 pp <br /> (MW-4). MtBE was reported in two wells sampled this quarter at concentrations of 246 ppb(MW-3) and 4,960 <br /> (MW-4).TCE was detected in two wells sampled at concentrations of 227 ppb(MW-1)and 96.6 ppb(MW-2) <br /> (upgradient and crossgradient wells). PCE was detected in one well this quarter at a concentration of 2.74 ppb <br /> (MW-1). Concentrations were generally consistent with historical data. Groundwater elevations across the site <br /> increased by an average of 2.31 feet this quarter and flow was east-southeasterly with a hydraulic gradient of <br /> 0.005 ft/ft. ARCO station demolition activities were completed in April 1999 and this site is currently vacant. <br /> h <br /> y <br /> 1 <br /> s <br /> :... ..�.,:.. ,. '..:...-.'.• -. ., _..e m s......w..s...., ..vex�......0�_.fi. ..-•,.,_ _�.a. <br />
The URL can be used to link to this page
Your browser does not support the video tag.