My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001292
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 1:57:23 PM
Creation date
2/25/2019 10:51:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001292
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: March 22, 2000 <br /> Quarter: 4099 ` <br /> ARCO QIiARTERLV GROUNDWATER MONITORING: REPORT <br /> 1-1ciht4 No.: 4493 Address 205 North Center Street, S'tockton, C'A <br /> ARC'() Lnvirowrwntal PnginGcr- Chuck Carmel <br /> COIINLJllln;l, U0. Contact Person I&VOR Intemationul Incorporated RustN Bcnkosky <br /> Consultant Projrct No.: 077.41819.007 <br /> Primary Agcncy'RUgUlaiory 11) No,: San Joaquin County knvironmental l Icalth Department <br /> Assembly Bill 681 Stains: Properly Owned by City ol-Stock-ton - — <br /> WORK PERFORMED THIS QUARTER ([Fourth Quarter - 7999): <br /> I. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Submitted work plan to the San Joaquin County Environmental Health Department for the investigation of the <br /> vertical and lateral extent of the 1VItBE plume. <br /> WORK PROPOSED FOR NEXT QUARTER (First Quarter-2000): <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Perrorm vertical and lateral investigation ai'thc ;vlt3F plume. <br /> Q I;JART E ISL:' RES LILTS S UM MARY <br /> Current Phase of Project: _Mon itoring/Assessment <br /> Frequency of Groundwater Sampling: MW-1 through MW-4 are sampled quarterly. <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP) Present On-Site:, No <br /> Current Remediation Techniques: Natural Attenuation <br /> Approximate Depth to Groundwater: 14.39 to 15.53 <br /> Groundwater Gradient: East @ 0.005 <br /> DISCUSSION: <br /> TPlIg was reported in one of the four wells sampled this quarter at a concentration of 7,830 ppb(MW-4). Benzene <br /> was reported in two wells sampled this quarter at a maximum concentration of 260 ppb(MW-4). MtBE was <br /> reported in two wells sampled this quarter at concentrations of 677 ppb (MW-3)and 1,310 (MW-4). TCE was <br /> detected in two wells sampled at concentrations of 37.6 ppb(MW-1) and 53.4 ppb(MW-2) (upgradient wells). <br /> PCE was not detected in any of the four wells this quarter. Concentrations were generally consistent with historical <br /> data. Groundwater elevations across the site decreased by an average of 2.83 feet this quarter and flow was easterly <br /> with a hydraulic gradient of 0.005 ft/ft. ARCO station demolition activities were completed in April 1999 and this <br /> i <br /> site is currently vacant. <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.