My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001293
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 1:38:46 PM
Creation date
2/25/2019 10:55:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001293
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> Date: December 27, 1999 <br /> Quarter: 3Q99 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 4493 Address: 205 North Center Street, Stockton, CA <br /> ARCO Environmental Engineer: Chuck Carmel <br /> Consulting Co./Contact Person: SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No.: 077.41819.002 <br /> Primary Agency/Regulatory ID No.: San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status: Property Owned by City of Stockton <br /> WORK PERFORMED THIS QUARTER (Third Quarter— 1999): <br /> 1. Performed third quarter groundwater monitoring event. <br /> 2. Prepared and submitted second quarter 1999 groundwater monitoring report. <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter- 1999): <br /> 1. Prepare and submit third quarter 1999 groundwater monitoring report. <br /> 2. Perform fourth quarter groundwater monitoring event. <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project: Monitoring/Assessment <br /> Frequency of Groundwater Sampling: MW-1 throughMW-4 are sammled quarterly. <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP)Present On-Sits: No <br /> Current Remediation Techniques: Natural Attenuation <br /> Approximate Depth to Groundwater: 12.24 to 12.72 <br /> Groundwater Gradient: NA <br /> DISCUSSION: <br /> TPH-g,benzene,and MtBE were reported in one(MW4)of the two wells sampled this quarter at a concentrations <br /> of 4,880 ppb, 173 ppb,an 670 ppb,respectively. TCE was detected in both wells samples at concentrations of 54.4 <br /> ppb(MW-2) and 8.44 ppb(MW4). PCE was not detected in either well this quarter. Concentrations were <br /> consistent with historical data. Only two of the four wells were sampled this quarter. Stockpiled soil from <br /> construction activities on adjacent sites covered wells MW-1 and MW-3 and made them inaccessable. ARCO <br /> station demolition activities were completed in April 1999 and this site is currently vacant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.