Laserfiche WebLink
ARCO I BP WELL MONITORING DATA SHEET <br /> TS # Starion # Gf <br /> Sampler , �S Date <br /> _&29 <br /> Well I D • ` Well Diameter 3 4 6 S <br /> Total Well Depth Zo Depth to Water /� y <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to PVC Grade D.O Meter (if req'd) Ysl HACH <br /> 2`I well D{artteter Nti1103111W01 Dinmeler ?V1011In icr <br /> " <br /> 004 4' 065 <br /> 2" 0 16 6" 147 <br /> Y G37 Other radius2,0 163 <br /> Purge Method Bader Sampling Method Bailer <br /> Disposable Bailer Disposable Bailer"� <br /> Middleburg f EXtractlop Port <br /> Electne Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> Y _ = 12 Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pH (mS ort Gals Removed Observations <br /> G 0 <br /> z)'I✓ 3z. <br /> Did well dewater? Yes o Gallons actually evacuated 2 <br /> Sampling Time: t Sampling Date <br /> Sample 1 D _f�- Laboratory Pace equoia Other <br /> Analyzed for TP11-G 13TEX MTBE TPH-D Other ' <br /> +� <br /> O (if 1 eq'd) Pre-purge mg/L Post-purge nig/L <br /> ORP (ifieq'd) Pre-puige mV Post-purge 117V <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />