My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001298
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 11:53:11 AM
Creation date
2/25/2019 11:02:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001298
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date May 15, 2003 <br /> Quarter 1$i Quarter,2003 <br /> • ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 4493 <br /> Address 205 N Center St , Stockton, CA <br /> Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth _ <br /> Consultant Project No 38466104 00436 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> (SJCEHD) <br /> Assembly Bill 681 Status Propeowned by Ci of Stockton <br /> WORK PERFORMED THIS QUARTER (First 2003): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (Second 2003): <br /> 1 Conduct quarterly groundwater monitoring and sampling , <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Obtain permits for further assessment work <br /> . 4 Schedule further assessment work <br /> QUARTERLY RESULTS SUMMARY (First 2003): <br /> Current Phase of Project Monitoring/Assessment <br /> Frequency of Groundwater MW-1 through MW-11 1 D sampled quarterly <br /> Frequency of Groundwater Quarterly <br /> Is Free Product (FP) Present Onsite No <br /> Current Remediation Techniques Natural attenuation <br /> Approximate Depth to Groundwater 14 00 to 20 41 ft <br /> Groundwater Flow and Gradient Northeast @ 0 013 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the electronic and hardcopy data (chain-of-custody records,blanks,dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following limitations <br /> • The reported results for methyl tert-butyl ether (MtBE) and total petroleum hydrocarbons as gasoline <br /> (TPHg) in sample MW-8D should be considered estimated due to a high relative percent difference <br /> reported between the associated MS and MSD <br /> • Elevated reporting limits were due to dilutions performed by the laboratory in order to quantitate a target <br /> . analyte <br /> K1Wp,oc.95 BP ARC0Z4443VX.U,1y11 QTR 0314493 GWMR 1Q03 doc Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.