Laserfiche WebLink
'YELL DEVELOPMENT LOG well Number <br /> SECOR Client Job No <br /> Location Sample Time <br /> :5o <br /> W ® AII. SEACQR Rep Sample A <br /> OR <br /> DEVELOPMENT/PURGING LOG <br /> DTFP DTW DTB EPurged <br /> DATE TIME (0 01) (0 01) (0 01) Temp EC Turb,ty <br /> ft. R ) H OF 14 mohs Color <br /> q 60 <br /> r0I 00 "] 2 -,14)9 <br /> V <br /> 10,31 1,500 691 z C-L <br /> .✓ <br /> Well Volume Calculations Recovery Calculations <br /> z n <br /> • <br /> Water 001u= CID DTs-DTw •Ba,Tcr/Pum <br /> •CWIng Damater ffl.4" •Pump Rate <br /> •Qwh g ppm&y(gam) (e1q 1 2-(016).4'(.65) •DTW Before <br /> rMing <br /> •2!ft WC Volume •DTW After <br /> •Borehole Diameter 5",�",10' •Rcoovery Tme Atter 90%WC <br /> RwAarge <br /> •Borehole C*pwhy (RE) 6"(1.46),9'(2.6), •Recovery rune To Static water <br /> 10'x(4 1) Level <br /> •Borehole WC volume (Bn Mwcm. a fyuiin <br /> •Pott S 3 •C bmmenta <br /> •A=In WC;Volume A <br /> •Total Well.Volume cm CV+AV <br /> •Id[&.Devel Vol M%1 10xM <br /> •ave Prudact Thic$aeas DTW DTFP <br /> cvQsrw.+�.t9tera,. wi <br />