My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001306
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 12:24:14 PM
Creation date
2/25/2019 11:04:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001306
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(ik <br /> Date January 30,2002 <br /> • Quarter 4Q01 <br /> FORMER ATLANTIC RICHFIELD COMPANY QUARTERLY GROUNDWATER <br /> MONITORING REPORT <br /> Facility No 4493 Address 205 N Center St , Stockton,CA <br /> Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 077 43280 704 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department(SJCEHD) <br /> Assembly Bill 681 Status Property owned by City of Stockton <br /> WORK PERFORMED THIS QUARTER (Fourth Quarter - 2001): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and subnutted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (First Quarter - 2002): <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> . 3 Install multi-completion wells once construction activities by the City of Stockton are complete <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitortng/Assessment <br /> Frequency of Groundwater Sampling MW-1 through MW-7 sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present Onsite No <br /> Current Remediation Techniques Natural attenuation <br /> Approximate Depth to Groundwater 11 to 17 ft <br /> Groundwater Flow and Gradient Northeast @ 0 015 ft/ft <br /> DISCUSSION: <br /> Total petroleum hydrocarbons as gasoline(TPHg) were reported in four of the seven monitoring wells sampled this <br /> quarter at concentrations ranging from 54 ppb(MW-5)to 1,900 ppb(MW-3) Benzene, analyzed by EPA Method <br /> 826013,was reported in three of the seven wells at concentrations ranging from 5 9 ppb(MW-5)to 39 ppb(MW-3) <br /> Methyl tert-butyl ether(MtBE),analyzed using EPA Method 8260B,was reported in four of the seven wells with <br /> concentrations ranging from 1 6 ppb(MW-2)to 150 ppb(MW-3) Other fuel oxygenates were not detected to the <br /> wells,some volatile orgainic compounds were detected at low concentrations(Table 3) Chemical concentrations <br /> were generally consistent with previous quarterly data with the following exceptions TPHg, benzene,toluene, <br /> ethylbenzene,and xylenes concentrations in well MW-3 increased significantly,TPHg,benzene,ethylbenzene, <br /> xylenes,and MtBE concentrations in well MW-4 decreased significantly, and TPHg, benzene,xylenes,and MtBE <br /> concentrations in well MW-7 increased Groundwater elevations decreased by an average of 0 44 feet Groundwater <br /> flow was to the northeast at an approximate gradient of 0 015 ft/ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.