My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001312
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 2:31:32 PM
Creation date
2/25/2019 11:05:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001312
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Date January 25,2001 <br /> • Quarter 4Q00 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 4493 Address 205 North Center Street, Stockton,CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No 077 41907 704 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status Property Owned by City of Stockton <br /> WORK PERFORMED THIS QUARTER (Fourth Quarter—2000): <br /> 1 Conducted quarterly groundwater momtonng and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Prepared and submitted work plan for additional site assessment,"Work Plan for the Installation of Multi- <br /> Completion Wells",(SECOR,November 16,2000)and"Addendum to Work Plan for the Installation of <br /> Multi-Completion Wells",(SECOR,December 20,2000) <br /> WORK PROPOSED FOR NEXT QUARTER (First Quarter—2001): <br /> . 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Install multi-completion wells <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Protect Monitonng/Assessment <br /> Frequency of Groundwater Sampling MW-I through MW-7 are sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present On-Site No <br /> Current Remediation Techniques Natural Attenuation <br /> Approximate Depth to Groundwater 13 %to 16 feet <br /> Groundwater Gradient East 0 0 005 ft/ft <br /> DISCUSSION: <br /> TPHg was reported in four of the seven groundwater morutonng wells sampled this quarter at concentrations ranging <br /> from 81 1 ppb(MW-3)to 3,640 ppb(MW-4) Benzene was reported in four of the seven wells sampled this quarter at <br /> concentrations ranging from 0 674 ppb(MW-3)to 219 ppb(MW-4) MtBE(EPA Method 8260) was reported in four <br /> wells sampled this quarter at concentrations ranging from 2 34 ppb(MW-7) to 427 ppb(MW-4) Trichloroethene <br /> (TCE) was reported in four of the seven wells sampled this quarter at concentrations ranging from 2 72 ppb(MW-5)to <br /> 189 ppb(MW-1) Cis-1,2-Dichloroethene was reported in five of the seven wells sampled at concentrations ranging <br /> from 2 98(MW-5)to 308 ppb(MW-1) Groundwater elevations across the site decreased by an average of 1 35 feet <br /> this quarter Groundwater flow was to the east with a hydraulic gradient of approximately 0 005 ft/ft,groundwater flow <br /> is consistent with previous groundwater gradients <br />
The URL can be used to link to this page
Your browser does not support the video tag.