My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001315
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 12:27:12 PM
Creation date
2/25/2019 11:06:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001315
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•ti <br /> l\ F <br /> URS <br /> Ms Lori Duncan Page 4 <br /> San Joaquin County Environmental Health Department <br /> July 26, 2004 <br /> interval from 45 to 50 feet bgs (for MW-13D) A Monterey No 3 silica sand filter pack was installed <br /> from 51 feet bgs to 2 feet above the well screen A 12-foot bentonite annular seal was placed above the <br /> lower sand pack The upper well screen (for MW-13M) was placed from approximately 15 to 30 feet <br /> bgs The upper filter pack was placed from approximately 13 to 31 feet bgs A bentontte transition seal <br /> was placed from approximately 11 to 13 feet bgs Neat cement was used to seal the remaining annular <br /> space to the surface The surface was completed with a 12-inch flush-mounted well box, and a locking, <br /> water-tight well cap was placed on each well Well construction details are shown on the boring log in <br /> Attachment C <br /> Soil cuttings and wastewater generated during the drilling activities were placed in labeled 55-gallon US <br /> Department of Transportation (DOT)-approved steel drums pending disposal <br /> Subsurface Conditions <br /> The boring log for boring SO-3 is included in Attachment C The subsurface at the site is composed of <br /> interbedded layers of sand, silt, and clay First water was encountered at approximately 20 feet bgs in <br /> • boring SO-3 (MW-13M/D) Upon completion of drilling, the groundwater level stabilized at <br /> approximately 19 8 feet bgs in MW-13M and at approximately 20 3 feet bgs in MW-13D <br /> Monitoring Well Development, Sampling, and Surveying <br /> On May 12, 2004, Blaine Tech Services (BTS) of San Jose, California, developed MW-13M and MW- <br /> 13D by rigorously surging over the length of each respective screen interval and by purging 10 casing <br /> volumes of water from each well Well development data sheets are included in Attachment D <br /> On June 8, 2004, BTS collected groundwater samples from the newly installed groundwater monitoring <br /> wells Groundwater samples were analyzed for gasoline range organics (GRO), benzene, toluene, ethyl- <br /> benzene, and xylenes (BTEX), and fuel oxygenatesladditives and selected halogenated volatile organic <br /> compounds (HVOCs) by EPA Method 8260B Samples were non-detect for GRO, BTEX, MtBE and <br /> fuel oxygenates/additives Field and laboratory procedures are provided in Attachment G The only <br /> volatile organic compound (VOC) detected in samples was cis-1,2-dichloroethene at 28 p.g/L in MW- <br /> 13M and 12 µg/L in MW-13D Attachment E presents groundwater sampling field sheets and <br /> laboratory analytical results Tabulated analytical results are provided in Tables 1-1 through 1-4 <br /> Analytical data for the other site wells will be included in the second quarterly report for 2004 <br /> On May 19, 2004, lateral positions and top of casing elevations for the MW-13MID were surveyed by <br /> Morrow Surveying of West Sacramento, California Survey data are included as Attachment F <br /> K 1WproeessU5 BP ARCO%044931May Well 0414493 well installation report04b dm <br />
The URL can be used to link to this page
Your browser does not support the video tag.