My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001316
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
ARCHIVED REPORTS XR0001316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 2:17:24 PM
Creation date
2/25/2019 11:06:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001316
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date August 2,2004 <br /> Quarter 2°3 Quarter,2004 <br /> • ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 4493 <br /> Address 205 N Center St , Stockton, CA <br /> Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URSNernon Elarth <br /> Consultant Project No 38466465 OL058 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> SJCEHD <br /> Assembly Bill 681 Status Property owned by City of Stockton <br /> WORK PERFORMED THIS QUARTER (Second 2004): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Installed additional downgradient well nest <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2004): <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY (Second 2004): <br /> Current Phase of Project Monitoring/Assessment <br /> Frequency of Groundwater Sampling MW-1 through MW-12D sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present Onsite No <br /> Current Remediation Techniques Natural attenuation <br /> Approximate Depth to Groundwater 13 34 to 25 38 feet below ground surface (bgs) <br /> Groundwater Flow and Gradient Northeast C 0 01 feet/foot (ft/ft) <br /> ANALYTICAL DATA REVIEW: <br /> Please note that as of April 1,2004,the laboratory has changed the carbon range for gasoline range organics (GRO) <br /> from C6 — CIO to C4 — C12 (to include the oxygenates) The resulting data may be impacted by the potential <br /> inclusion of additional total petroleum hydrocarbons as gasoline (TPHg) and non-TPHg analytes within the revised <br /> carbon range, which may result in a higher reported concentration Where the resulting GRO concentration is based <br /> on a single analyte(i e ,a non-TPHg analyte or a single TPHg analyte),the analyte will be identified if possible <br /> Based on the review of the electronic and hardcopy data (chain-of-custody records,blanks, dilutions, holding times, <br /> LCS/LCSD results, MS/MSD results, and surrogate recoveries), the data are acceptable as reported by the <br /> laboratory <br /> K%WP+0cessV5 SP ARCOkO4493%Q.a t—lyi2 QTR 0714443 GWMR 2Q04 do Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.