Laserfiche WebLink
- ARCO / BP WELL MONITORING DATA SHEET <br /> rTotal <br /> r Station# <br /> Date <br /> / �iof Well Diameter � 3 4 G 8 <br /> lt Depth =�- �3' Depth to Water. f <br /> Depth to Free Product Thickness of Free Pi oduct (feet) <br /> Referenced to (PV0 Grade D O Meter (if req'd) YSI HACH <br /> We11 Q�smctcr u11nlFcr well Dame NiultiplleC <br /> 004 4' 065 <br /> 2' 0 16 6. 1 47 <br /> 3' 037 Other radws�•0 163 <br /> Purge Method Bailer Sampling Method Sailer <br /> Disposable Bailer Disposable Bailcr✓ <br /> Middleburgz Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen [#'well is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> . 5 X 13 _ Gals <br /> I Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pH (MS orµS) Gals Removed Observations <br /> 1. <br /> Did welt dewater? Yes No Gallons actually evacuated- <br /> Sampling Time o � Sampling Date <br /> Sample LD ,�y , Laboratory Pace equola Otlier � <br /> Analyzed forEI-G TLX MT13E TPI-[-D Other � � is �� I -1 Cly 1-1 it(y- <br /> nigr <br /> • DO (if req'd) Pre-purge n, 1� Post-purge i <br /> OR P (if recl'd) Pte-purge MV Post-purge <br /> rn V <br /> Elaine Tech Services, Inc. '1680 Rogers Ave., San Jose, CA 95.112 (408) 573-0555 <br />