Laserfiche WebLink
ARCO / BP WELL MONITORING DATA SHEET <br /> BTS # Station# <br /> 031 �- <br /> Samplei Pt, Date I x31,., <br /> WellLD tj _ i Well Diameter 3 4 G S <br /> Total Well Depth- l , Depth to Water fq 3q <br /> Depth to Fiee Product Thickness of Free Product (feet) <br /> Referenced to 25C Grade D O Meter (if ieq'd) yn f-LACH <br /> -VdLDjamL= tuuanlux MAI 12Izujacr huiliii 11M <br /> 1 ' 004 4" 005 <br /> 2" 016 fi' 147 ����alo 314 <br /> Y 037 OLIM radius'°0 163 <br /> Pure Method Bailer Sampling Method Bailer <br /> Dispotiable Bailer ADisposable Bailer <br /> OCPositive Air Displacement Extraction fort <br /> Electric Submersible Other <br /> Extraction,Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge, confirm that welter level is below the top <br /> of sel een Otherwise, the well must be purged <br /> __ S X ---- — ---. I — Gals <br /> Case Volume(Gals ) Specified'Volumes Calculated Volume <br /> Collductivlty <br /> Time Temp (°F) pH (mS orµS) Gals Removed ObseLvatlons <br /> �-I� �• S4 a. �• (� e a r a sr <br /> :� (0 a13 S o ss Im, 0A q <br /> o rte, <br /> Did well dewater2 Yes o Gallons actually evacuated IT <br /> Sampling Time j 3 Sampling Date t a <br /> Samplel.1) M W- M Laboratory lace She other <br /> Analyzed for TPH-G BTEX MTBE TPI1-D Okller S e✓Br <br /> Ca L <br /> DO (if req'd) Pre-purge Ing/L PaleL 'nSk <br /> O R P (if req'd) Pie-purge MV Post-purge MV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave,, San Jose, CA 95112 (408) 573-0555 <br />