My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011671
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
221
>
2900 - Site Mitigation Program
>
PR0506624
>
ARCHIVED REPORTS XR0011671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 12:45:57 PM
Creation date
2/25/2019 11:15:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011671
RECORD_ID
PR0506624
PE
2950
FACILITY_ID
FA0007549
FACILITY_NAME
WEBER POINT SEAWALL
STREET_NUMBER
221
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
221 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�I <br /> Significance after Mitigation: Less than significant <br /> Implementation and Monitoring Program: <br /> Implementation Public Works Department ' <br /> Monitoring The Public Works Department will ensure that the appropriate permits are <br /> obtained from the U S Army Corps of Engineers, Department of Fish and Game, and the <br /> i RWQCB, prior to commencement of construction ' <br /> e: Discharge into surface waters,or in any alteration of surface water Quality including but <br /> not limited to,temperature,dissolved oxygen,or turbidity9 ' <br /> Answer: No However, dredging of potential debris beneath the proposed sheetpile(Sheet 4 <br /> of 6)and placement of rock rip-rap is anticipated to temporarily increase turbidity ' <br /> Approximately 20,000 ft3 (835 ft x 12 ft x 2 ft)of rock rip rap material may be placed at the <br /> base of the seawall below the waterline along the length of the seawall Alternatively, <br /> 1� approximately 16,650 ft'(I 11 ft x 30 ft x 5 ft)of rock rip-rap material may need to be placed ' <br /> a� II at the base of the seawall along the southern border of the ARCO gas station The height of' <br /> e rip-rap varies and may be up to 7 ft high at the seawall adjacent to the ARCO gas station <br /> Level of Significance: Not significant ' <br /> Mitigation Measures: The Ci tyaPPlied for the necessary U S Army Corps of Engineers <br /> Section 404 permits on 18 July 1997(Appendix C) The City obtained the requisite Section <br /> 404 nationwide and Section 10 permits from the Corps in August 1997 (Appendix C) The ' <br /> { Section 404 permits consist of a Nationwide 13 and a Nationwide permit 25 The Corps <br /> authorized the Section 10 portion of the project under a Letter of Permission Prior to <br /> q commencement of construction the City will consult with the Department of Fish and Game <br /> regarding a 1601 Streambed AIteration Agreement,and with the Regional Water Quality <br /> Control Board fora 401 Water Quality Certification or waiver(see Appendix B, page 16) <br /> g The City and its subcontractors will comply with the stipulations as set forth in these permits ' <br /> {C Significance after Mitigation: Less than significant <br /> F <br /> lrImplementation and Monitoring Program: <br /> Implementation Public Works Department <br /> Monitoring The Public Works Department will ensure that the appropriate permits are <br /> y obtained from the U S Army Corps Engineers,Co s of En Department of Fish and Game and the ' <br /> RWQCB, prior to commencement of construction <br /> F f Alteration of the direction or flow rate of groundwater? <br /> IF <br /> Answer- No The proposed project will not affect the direction or flow rate of groundwater ' <br /> Level of Significance- Not significant w <br /> jC Mitigation Measures None required <br /> i 'Significance after Mitigation: NIA ' <br /> I� <br /> I� EX_[5 M DOC 9/2!97 20 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.