Laserfiche WebLink
16 <br /> b. Effects on existing parking facilities,or demand for new parking? <br /> ' Answer: No The completed project will not result in a demand for additional parking <br /> Sufficient parking is available for workers during construction because they would park on- <br /> site <br /> Level of Significance:Not significant <br /> Mitigation Measures:None required <br /> ' Significance after Mitigation:NIA <br /> c. Substantial impact upon existing transportation system(individually or cumulatively <br /> ' exceeding the Level of Service "D" standard along roadways and at intersections)? <br /> Answer: No The completed project will not create a demand on existing transportation <br /> facilities <br /> ' Level of Significance:Not significant <br /> Mitigation Measures:None required <br /> ' Significance after Mitigation:NIA <br /> d. Alterations to present patterns of circulation or movement of people and/or goods? <br /> Answer: No See Section 13 a <br /> Level of Significance:Not significant <br /> Mitigation Measures:None required <br /> Significance after Mitigation:NIA <br /> ' e Alterations to waterborne, rail,or air traffic9 <br /> Answer: No See Section 13 a <br /> ' Level of Significance:Not significant <br /> Mitigation Measures- None required <br /> ' Significance after Mitigation:NIA <br /> ' f Increase in traffic hazards to motor vehicles,bicyclists,or pedestnans9 <br /> Answer: No See Section 13 a <br /> Level of Significance: Not significant <br /> ' Mitigation Measures. None required <br /> Significance after Mitigation NIA <br /> 1 <br /> EX-M-04 DOC 9/2M7 27 <br /> I <br />