Laserfiche WebLink
I <br /> I� I <br /> 4 bottom adjacent to the seawall If rock rip-rap is used,the project study area would extend up to an additional 30 feet into the <br /> channel(Sheet 4,Appendix A) The project study area does not include any other portion of Weber Point <br /> 6 Applications Currently Under Ci tyReview File Number(s) <br /> � <br /> di7 Otlier permits/reviews required by the City,County,State,Federal and/or other agencies for project unplementation ' <br /> it Agency Permits/Reviews <br /> U S Army Corps of Engineers Nationwide 13 and 25 Permits,Section 10 Letter of Permission <br /> Department of Fish and Game 1601 Streambed Alteration Agreement ' <br /> f <br /> Regional Water Quality Control Board 401 Water Quality!Certificatton <br /> � U S Fish and Wildlife Service Informal Consultation <br /> Cultural Heritage Board Certificate of Appropriateness <br /> it <br /> II 8 Describe any proposed General Plan amendments and/or prezoning/rezoning requests <br /> I� General Plan Designations Acres Zoning Districts Acres <br /> NIA to to <br /> N/A to to <br /> �I <br /> 4 <br /> �I 9 Describe any site alterations which result from the proposed project(specifically address the amount and location of grading, <br /> �I cuts and fills,vegetation removal,alterations to drainage,removal of existing structures,number of trees removed,etc} <br /> The site work includes approximately,4,000 cubic yards of excavation behind the el xisting seawall, approximately 2 000 cy ' <br /> �i of controlled density fill and concrete fill on the waterside and underneath the existing seawall The to four feet of the existing <br /> �I <br /> Ithree-foot wide seawall will also be removed Clean materials will be graded on-site Unusable material and debris generated <br /> Iwill be disposed off-site in accordance with City and County,ordinances All existuia vegetation to be removed consists of non- <br /> e �} native,horticultural trees,shrubs,and ground covers Approximately 7 non-native trees will be removed_ <br /> Please refer to Section W,Environmental Analysis <br /> 10 Specific Project Description/Operational Characteristics <br /> I' a Describe proposed Commercial,Industrial and Institutional uses(includes recreational and other non-residential uses) <br /> Propose Site , <br /> ly Propose Structure Require Parking <br /> (1) Proposed Land Use(s) Zoning Acreage I Sq Ft Parking Provided ' <br /> li New Weber Point Southbank 0 2 90,180 0 0 <br /> Seawall I <br /> y Totals 0 2 j 90,180 0 0 <br /> it (2) Describe project phasing(location/timing) BeginningaRroximatelly March 1998 continuing through Jul <br /> 1999 <br /> (3) Hours of operation N/A <br /> (4) Number of employees/work shifts N/A <br /> ex Ss M Doc ansrvi 4 <br /> _ <br />