My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS - GROUNDWATER MONITORING WELL INSTALLATION AND LIMITED SOIL SAMPLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
317
>
2900 - Site Mitigation Program
>
PR0516724
>
ARCHIVED REPORTS - GROUNDWATER MONITORING WELL INSTALLATION AND LIMITED SOIL SAMPLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 3:12:32 PM
Creation date
2/25/2019 1:16:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
- GROUNDWATER MONITORING WELL INSTALLATION AND LIMITED SOIL SAMPLING
RECORD_ID
PR0516724
PE
2950
FACILITY_ID
FA0012756
FACILITY_NAME
ELKS LODGE PROPERTY
STREET_NUMBER
317
Direction
S
STREET_NAME
CENTER
City
STOCKTON
Zip
95202
APN
13731010
CURRENT_STATUS
01
SITE_LOCATION
317 S CENTER
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' kn KLEINFELDER <br /> ' TABLE OF CONTENTS <br /> ' CHAPTER PAGE <br /> 1 EXECUTIVE SUMMARY..............................................................................................................................1 <br /> 2 SITE SETTING................................................................................................................................................5 <br /> 2.1. SITE LOCATION....................................................................................................................................5 <br /> ' 2.2. CURRENT USE AND SITE CHARACTERISTICS...............................................................................5 <br /> 2.3. REGIONAL GEOLOGY AND HYDROGEOLOGY..............................................................................5 <br /> 3 BACKGROUND...............................................................................................................................................7 <br /> ' 4 FIELD ACTIVITIES.......................................................................................................................................9 <br /> 4.1. PRE-FIELD ACTIVITIES .......................................................................................................................9 <br /> ' 4.2. MONITORING WELL INSTALLATION...............................................................................................9 <br /> 4.3. MONITORING WELL DEVELOPMENT............................................................................................11 <br /> 4.4. MONITORING WELL SAMPLING.....................................................................................................11 <br /> ' 5 LABORATORY ANALYSIS........................................................................................................................12 <br /> 5.1. MONITORING WELL SOIL BORING SAMPLING............................................................................12 <br /> 5.2. MONITORING WELL GROUNDWATER SAMPLING.....................................................................12 <br /> ' 5.3. ADDITIONAL LIMITED SOIL SAMPLING.......................................................................................13 <br /> 6 RESULTS........................................................................................................................................................14 <br /> ' 6.1. GROUNDWATER FLOW DIRECTION AND GRADIENT___..............................*....***,****....**......14 <br /> 6.2. MONITORING WELL SOIL BORING SAMPLING RESULTS.........................................................14 <br /> 6.3. GROUNDWATER SAMPLING RESULTS..........................................................................................15 <br /> 6.4. ADDITIONAL LIMITED SOIL SAMPLING RESULTS.....................................................................17 <br /> ' 7 CONCLUSIONS AND RECOMMENDATIONS.......................................................................................19 <br /> 7.1. CONCLUSIONS ....................................................................................................................................19 <br /> 7.2. RECOMMENDATIONS........................................................................................................................21 <br /> 8 LIMITATIONS..............................................................................................................................................22 <br /> Text Tables: <br /> ' Table 1 Monitoring Well Locations...............................................................................................................9 <br /> Table 2 Monitoring Well Construction Detail..............................................................................................10 <br /> Table3 Monitoring Well Elevations............................................................................................................10 <br /> Table4 Groundwater Elevations..................................................................................................................11 <br /> 1 Table 5 Monitoring Well Soil Boring Sample Results.................................................................................15 <br /> Table 6 Groundwater Laboratory Results(May 3,2004).............................................................................16 <br /> Table 7 TTLC and STLC Shallow Soil Sample Results...............................................................................17 <br /> ' Plates: <br /> Plate 1 —Site Location Map <br /> Plate 2—Monitoring Well and Soil Boring Location Map <br /> Plate 3—Lead Concentration and Proposed Excavation Limit Map <br /> ' Appendices: <br /> A—Monitoring Well Permit E—Laboratory Data Sheets <br /> B—Soil Boring Logs F—Groundwater Monitoring Well Survey Map <br /> C—Monitoring Well Development Logs G—Typical Kleinfelder Field Protocol <br /> D—Monitoring Well Sampling Logs <br /> ' 42162.E01 /ST04R854 Page iofi <br /> Copyright 2004,Kleinfelder,Inc. July 1,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.