My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
317
>
2900 - Site Mitigation Program
>
PR0516724
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 3:06:21 PM
Creation date
2/25/2019 1:19:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516724
PE
2950
FACILITY_ID
FA0012756
FACILITY_NAME
ELKS LODGE PROPERTY
STREET_NUMBER
317
Direction
S
STREET_NAME
CENTER
City
STOCKTON
Zip
95202
APN
13731010
CURRENT_STATUS
01
SITE_LOCATION
317 S CENTER
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Inc., Environmental & Engineering Group <br /> ' Health & Safety Plan <br /> 1.0 Health and Safety Plan <br /> WHF, Inc., Environmental & Engineering Group has adopted the following health and safety <br /> procedures for working with organic vapors and liquid contaminants encountered during <br /> ' drilling and excavation of subsurface soil. The purpose of this program is to provide health <br /> and safety precautions for the initial and subsequent site visits until the nature and magnitude <br /> ' of the contaminants have been defined. <br /> 1.1 Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation or site clean-ups will <br /> have an assigned responsibility. The outlined responsibilities will establish standards <br /> ' for personnel protective wear, safety procedures and provide for emergency actions <br /> which could arise during project operations. <br /> 1.2 Project Manager (PM <br /> The Project Manager directs all project operations. Project Manager (PM), in <br /> cooperation with the Project Safety Officer (PSO), has the primary responsibility for <br /> ensuring that the safety plan is read, signed, and fully understood by all employees and <br /> outside persons allowed around or within designated working perimeters of the job site. <br /> In cooperation with the PSO, he is responsible for ensuring that at all times during <br /> ' project operations, all employees adhere strictly to the Health and Safety Plan. <br /> ' 1.3 Project Safety Officer (PSO) <br /> The PSO shall direct and ensure that all employees comply with the Health and Safety <br /> ' Plan. The PSO has the primary responsibility for: <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site personnel. <br /> 2. Assuring that personnel are aware of the provisions of this plan, are instructed <br /> ' in the work practices necessary to ensure safety, and in planned procedures for <br /> dealing with emergencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.