My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:08:32 PM
Creation date
2/25/2019 1:32:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • <br /> January 5, 1996 <br /> 110716.FS.ZZ <br /> SCOPE OF WORK <br /> The following is a scope of work for performing drilling services at the PG&E facility <br /> located at 535 Center Street Stockton, California. <br /> The work consists of hollow-stem auger drilling(3) 8-inch diameter soil borings to a total <br /> depth of 25 feet below ground surface(bgs)in Source Area 1, (3)8-inch diameter borings to <br /> a total depth of 20 feet bgs in Source Area 2,and(1) s-inch diameter boring to a total depth <br /> of 10 feet bgs in Source Area 3. The Source Area 1 and 2 soil borings will be sampled every <br /> 5 feet with a modified California split-spoon sampling device. In addition,the drill cuttings <br /> will also be sampled. Bulk drill cuttings samples from selected intervals will be placed in 5 <br /> gallon plastic buckets that will be subsequently sealed with a tight fitting lid. The remaining <br /> cuttings will be placed in 55 gallon drums.The Source Area 3 boring will be drilled and <br /> continuously sampled from surface to 5 or 10 feet bgs using a modified California split spoon <br /> sampling device. The California-modified split-spoon sampling device will be lined with <br /> brass sampling tubes. <br /> Upon completion the borings will grouted with Portland neat cement. The cement will be <br /> tremied to the base of the hole to ensure a quality sanitary seal. All drilling equipment will <br /> be properly steam-cleaned and decontaminated between borings to avoid potential cross <br /> contamination. The subcontractor will provide the necessary equipment to contain all water <br /> and soil generated during the decontamination process. <br /> clmywmNexcCRpgeetlm\p hsseI W wriug96.doc <br /> zoo In 'I1IH NOD 2099 999 OTS TM LC:OT (1HA 90/8Z/T0 <br /> a# !N011VUOIdX3 wH1O3ds — 9OZ8 ESB OL9 `VC:6 !96-oz-L :09AI3O3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.