My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:08:32 PM
Creation date
2/25/2019 1:32:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Source area#3. This is the location of the former tar pit. Adjacent soil samples <br /> contained PNAs, TPH-diesel, and TPH-gasoline to a depth of 24 feet. This is <br /> assumed to be a pit frlled primarily with tar. <br /> • Source area#4. This is the location of a former diesel tank. Soil samples from <br /> this area contained PNAs and TPH_diesel. Groundwater from neighboring <br /> wells contains PNAs, benzene, and TPH-diesel. <br /> Other places where chemicals of potential concern were found in soil were in the vicinity of soil <br /> borings B-9,B-14,B-16,B-21, and SB-113. <br /> During previous investigations, lampblack,tar, and oily material were found in the fill material <br /> between 0 and 25 feet bgs at various locations across the site. Borings with significant amounts <br /> of lampblack, tar or oil at depths between 0 and 5 feet bgs in borings B-16, B-13, and, B-21, <br /> and occurred between depths of 5 and 20 ft bgs in borings B-15, B-17, B-14, SB-2, MW-10, <br /> MW-8, and B-11. Cyanide was found in borings B-13,B-14,B-15,MW-7, and MW-9. <br /> The following sections of this workplan present the objectives, scope,rationale, and <br /> methodologies for the supplemental soil investigation and subsequent reporting that will be <br /> completed at the PG&E Stockton site. <br /> M <br /> SF010030B7E.DOC 1-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.