My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1991-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:55:33 PM
Creation date
2/25/2019 1:36:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1991-1992
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA - ENVIRONMENTAL PROTECTION JbV PETE WILSON, Governor <br /> DEPARTMENT OF TOXIC SUBSTANCES CONTROL _ <br /> Region 1 <br /> 10151 Croydon Way,Suite 3 <br /> Sacramento,CA 95827-2106 <br /> (916)855-7700 <br /> September 17, 1991 <br /> SEP t 9 y1 <br /> Mr. Robert Doss, P.E. <br /> Project Manager <br /> Pacific Gas and Electric Company <br /> Environmental Services <br /> 77 Beale Street, Room F-1636 <br /> San Francisco, CA 94106 <br /> Dear Mr. Doss: <br /> PG&E STOCKTON, DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY <br /> (RI/FS) WORKPLAN <br /> The Department of Toxic Substances Control (Department) has <br /> reviewed the Draft Workplan for Supplemental RI/FS and Remedial <br /> Action dated August 1991 which was prepared for the site named <br /> above. The following are Department comments that need to be <br /> addressed before the RI/FS Workplan is approved: <br /> 1. All technical workplans and reports must be signed by a <br /> qualified Registered Professional Engineer or Registered <br /> Geologist. The RI/FS Woplan has not been signed. <br /> 2 . Groundwater monitoring wells should be installed at the <br /> watertable to clearly define the hydrology at the site. The <br /> depths of the proposed shallow wells are below the water <br /> table and would not be as effective. <br /> 3 . The groundwater monitoring reports should include diagrams <br /> with equipotential lines to indicate groundwater direction. <br /> 4. Chapter 1 - Provide a detailed description of all industrial <br /> operations including a discussion of all hazardous <br /> substances, materials or wastes which were disposed, <br /> discharged, stored, transported, handled or used at the Site <br /> and a description of their estimated volumes and <br /> concentrations. Include a discussion of all processes which <br /> were related to each hazardous substance, material or waste. <br /> Identify all uncertainties related to the history of <br /> operation and make recommendations for additional work, such <br /> as conducting interviews and researching historical files <br /> and photographs, to eliminate these uncertainties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.