My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1991-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:55:33 PM
Creation date
2/25/2019 1:36:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1991-1992
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Pacific Gas and Electric Company Environmental Services <br /> P.O.Box 7640 <br /> July 31, 1991 San Francisco,CA 94120 <br /> 415/972-7000 <br /> Direct Dial 415/972- <br /> Telecopy 415/972-94T FtiA 'nMr. Val F. Siebal "',� �� y <br /> California Environmental Protection Agency r 4.Fa� , <br /> Department of Toxic Substances Control AUG <br /> 10151 Croydon Way <br /> Sacramento, CA 95827 ENVIRU(vt\AF.N,T HEALTH <br /> PERMIT/ <br /> Attention: Fernando Amador <br /> Dear Mr. Siebal : <br /> Please find enclosed two copies of our Work Plan for Supplemental Remedial <br /> Investigation, Feasibility Study, and Remedial Action Plan at PGE's Stockton <br /> Former MGP Site prepared under Consent Order HSA 90/91-008. This Work Plan <br /> addresses all the required elements of Section 3.1.3, except 3. 1.3 (a) Project <br /> Management, which is provided under separate cover. <br /> As specified in Section 3. 1 .2 of the Order, we are providing PG&E's responses <br /> to Department's comments on the previously submitted RI documents with this <br /> Work Plan. Comments received from the Department on June 29, 1990 were <br /> responded to by Mr. Robert Doss by letter dated July 31, 1990. For your <br /> convenience, this correspondence is attached and our responses herein follow <br /> the topical format of the July 31 response. <br /> - Subsurface Surveys <br /> As promised, we have performed ground penetrating radar and <br /> electromagnetic terrain conductivity surveys as part of our scoping <br /> investigation. The results of these surveys can be found in Section 2.2.2 <br /> of the Work Plan. <br /> - Retention of Soil Borings <br /> We have been unable to locate any cores from the 1987 sampling. <br /> Representative cores from future studies will be archived as a lithologic <br /> record and for reanalysis of non-volatile constituents as permissible <br /> under state and federal hazardous waste storage regulations. <br /> - Off-Site Soil Boring, Off-Site Groundwater Monitoring Wells <br /> The Work Plan proposes that off-site borings be conducted at two locations <br /> in Area III on the Morton Paint Company property. Pending the results of <br /> these activities, further investigation including groundwater monitoring <br /> wells may be considered. <br /> - Presentation of Lithologic, Analytic and Hydrologic Results <br /> PG&E intends to present soils data and findings as stratigraphic cross- <br /> sections in future reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.