My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 7:55:49 PM
Creation date
2/25/2019 1:38:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j Pacific Gas and Electric Company Environmental Services <br /> P.O.Box 7640 <br /> San Francisco, CA 94120 <br /> 415/973-7000 <br /> Direct Dial 415/973- <br /> Telecopy 415/973-9201 <br /> May 8, 1995 <br /> n <br /> James L. Tjosvold, P.E. <br /> Acting Chief, Site Mitigation Branch <br /> r California Environmental Protection Agency 1195 <br /> C` Department of Toxic Substances Control <br /> 10 15 1 Croydon Way, Suite 3 ENViRONMENTAL HEALTH <br /> Sacramento, California 95827 PERMIT/SERVICES <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Re: Docket#HSA 90/91-08 - Stockton Former Manufactured Gas Plant Site: <br /> Response to DTSC and RWQCB Comments on Technical Memorandum <br /> Attached is Pacific Gas and Electric Company's (PG&E's) response to the Department of <br /> Toxic Substances Control's (DTSC's) and the Central Valley Regional Water Quality <br /> Control Board's (RWQCB's) comments on the "Final Phase III Technical Memorandum, <br /> Stockton Former MGP Site, Pacific Gas and Electric Company", dated March 14, 1995. <br /> DTSC's comments on the Final Technical Memorandum were submitted in an April 12, <br /> 1995 letter to PG&E (the RWQCB's comments are attached to this DTSC letter). <br /> During an April 24, 1995 telephone conversation between DTSC and PG&E, DTSC <br /> agreed that PG&E could send its response to the comments in a letter, rather than sending <br /> a revised Final Technical Memorandum. Please note that the attached response letter has <br /> been perforated so that it may be inserted in the Final Technical Memorandum. <br /> If you have any questions or comments, please call me at (415) 973-6254. <br /> Patricia Sullivan <br /> Stockton Manufactured Gas Plant Site Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.