Laserfiche WebLink
I <br /> PROJECT NUMBER 8 BER <br /> iSAC31614.Ftl MW-6 SHEET I OF I <br /> Vft = WEL LETION LOG <br /> PROJECT PG&E Stockton MGP LOCATION A'ea I <br /> ELEVATION 13.55 ft., MSL DRILLING CONTRACTOR Beylik Drilling, Inc. <br /> DRILLING METHOD AND EQUIPMENT Ingersall-Rano RO-300 Mud Rotary Wire Line Sampler <br /> WATER LEVELS 46.63 ft. Dgs on 04/30/92 START 1/6/92 FINISH 1/14/92 LOGGER J. McHugh <br /> 0 GROUND SURFACE —Elevation:13.55 <br /> —Elevation:12.05 <br /> Y; <br /> n <br /> 10 s <br /> f a <br /> E <br /> zo _ <br /> c�sl <br /> f 1- a <br /> 30 0 <br /> O <br /> 40 <br /> V <br /> T <br /> O <br /> N <br /> w <br /> w <br /> � Q <br /> 60. — Elevation:-46.45 <br /> a <br /> w <br /> C <br /> i <br /> i' <br /> 80 <br /> i <br /> i <br /> r 90 <br /> 4 <br /> 1 O - <br /> 'f Elevalino:-60.45 <br /> v —Elevation:-83.45 <br /> f , I <br /> 100 — Elevation:-85.45 <br /> 0 Z, <br /> 1 Ser Cimm9 I r <br /> ACm[N Almg Ur <br /> —Elevation:-101.45 <br />