My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:49:12 PM
Creation date
2/25/2019 1:40:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electric. Company Environmental Services <br /> P.C.Box 7640 <br /> San Francisco, CA 94120 <br /> 415/973-7000 <br /> September 21, 1998 Direct Dial 415/973- <br /> ielecopy415/973-9201 <br /> REO VE1. ; <br /> James L. Tjosvold, P.E. SEP 2 2 1998 <br /> Chief, Site Mitigation Branch <br /> California Environmental Protection Agency ENVIRONMENTAL HEALTH <br /> i Department of Toxic Substances Control PERMIT / SERVICES <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Re: Docket#HAS 90/91-08 -Stockton Former Manufactured Gas Plant Site <br /> Subject: Soil and Residue Management Plan <br /> Dear Mr. Tjosvold: <br /> Pacific Gas and Electric Company (PG&E) requests that the procedures for <br /> managing excavated soil and residue, presented in the approved Remedial Action <br /> Plan (RAP) for the Stockton Former Manufactured Gas Plant Site (Site), be modified. <br /> As explained in the attached memorandum, Soil and Residue Management Plan, <br /> Stockton Former Manufactured Gas Plant Site, this request is based upon recent <br /> sampling results and recent regulatory changes. <br /> The attached memorandum discusses the results of the recent soil antl residue <br /> sampling conducted at the site, the recent regulatory changes which effect soil and <br /> residue management, and PG&E's new proposal to manage soil and residue <br /> excavated from the soil-source areas identified in the approved RAP. <br /> If you have any questions or require additional information, please call me at (415) <br /> 973-6254. <br /> Sincerely, <br /> Patricia E. Sullivan <br /> Project Manger- Stockton Former Manufactured Gas Plant Site <br /> cc: Mr. Gary Carlton, Executive Officer Mr. Ron Valinoti, Director <br /> California Regional Water Quality San Joaquin Local Health District <br /> Control Board PO Box 388 <br /> 3443 Routier Road, Suite A Stockton, CA 95201-0388 <br /> Sacramento, CA 95827-3098 Attention: Ms. Linda Turkatte <br /> Attention: Ms. Wendy Cohen <br /> Attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.