Laserfiche WebLink
f <br /> Mr. Val F. Siebal <br /> Page Two <br /> September 22, 1992 <br /> thick <br /> using and roller screed. The completed pad was a minimum of four inches <br /> Expansion jointsrond10with <br /> foot centers were cfilled ewith rprfabric <br /> emolde <br /> joint filler. Imported material was used as fill around utild expansion <br /> on <br /> it <br /> poles. <br /> Please let me know if you would like any addition detail regarding this <br /> project. You can reach me at (415) 973-1116. <br /> Sincerely, <br /> 411-0� /Ate/ <br /> Yvonne J. Meeks, R.G. , C.E.G. <br /> Manufactured Gas Plant Project <br />